LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #15   Report Post  
Wayne.B
 
Posts: n/a
Default

On Tue, 24 Aug 2004 23:53:33 -0400, Sunny wrote:

I'm thinking I'll rout all 4 edges of the 2x4 with a 3/4" round-over
bit, and mount it on the vertical face of the dock using 8"x3/8 lag
screws set into the gap between the two face boards with short lengths
of 3/4" galvanised steel pipe as spacers


=========================================

That's an interesting variation. I'm concerned that the 2x4 may have
a tendency to wobble however unless you use fairly large diameter
pipe. My spacers are 2x4 pieces cut to about 4 inch lengths.



 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
long term mooring design - an engineering question mitch Cruising 5 July 18th 04 05:05 PM
Life on a mooring Stu and Marilyn Wright Cruising 22 February 22nd 04 04:10 PM
Ring, Ring, Ring!!!! CANDChelp ASA 23 July 25th 03 03:44 PM
Overheating, Hydrostatic lock, ring gears and starters rayjking General 0 July 12th 03 05:49 PM
Need ring gear or specs for 1995 PCM 5.8 Pro Boss [email protected] General 6 July 10th 03 07:18 AM


All times are GMT +1. The time now is 09:30 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 BoatBanter.com.
The comments are property of their posters.
 

About Us

"It's about Boats"

 

Copyright © 2017