Home |
Search |
Today's Posts |
#1
posted to alt.binaries.pictures.tall-ships
|
|||
|
|||
icebreaker Radisson - CCGS Pierre Radisson below Lock2 2015-0331 IMG_0134.jpg
The Welland Canal season begins on Thursday April 2nd. But the CCGS
icebreaker Pierre Radisson is required in Lake Erie to bust up a LOT of ice. Don't think it is as bad as 2014, but it's still more than most recent seasons. There's no ice in the Canal (at least not below Lock 7, I didn't check above). Picture taken as the Radisson tied up briefly (for about 20 minutes) below Lock 2 in St Catherines Ontario. Steve |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Icebreaker Needed - CCGS Pierre Radisson out of Lock 3 2014-0317 IMG_3028.jpg | Tall Ship Photos | |||
CCGS Griffon Panorama in Lock3 2010-1202 - CCGS Griffon Panorama in Lock3 2010-1202 sm.jpg | Tall Ship Photos | |||
Palau at Lock2 Welland Canal Oct 31 2010 - Palau (Combi-Lift) Lock2 2010-1031 #7831e.jpg | Tall Ship Photos | |||
FS: BUILDING THE ST PIERRE DORY book in Eureka CA ebay | Marketplace | |||
FA: BUILDING THE ST PIERRE DORY | Boat Building |