Home |
Search |
Today's Posts |
#1
posted to alt.binaries.pictures.tall-ships
|
|||
|
|||
Icebreaker Needed - CCGS Pierre Radisson out of Lock 3 2014-0317 IMG_3028.jpg
It's the day before the Welland Canal officially opens. The Canal
itself has some ice: around Lock 7, and especially in Port Colborne which is next to the mostly frozen Lake Erie. But the rest of the system is iced up. So the Canadian Coast Guard has brought in a bigger icebreaker to try and get commercial shipping moving. Here the Pierre Radisson has left Lock 3 in St Catharines Ontario on its way to Lake Erie. Steve |
#2
posted to alt.binaries.pictures.tall-ships
|
|||
|
|||
Icebreaker Needed - CCGS Pierre Radisson out of Lock 3 2014-0317 IMG_3028.jpg
On Sun, 30 Mar 2014 20:21:58 -0400, Steve
wrote: It's the day before the Welland Canal officially opens. The Canal itself has some ice: around Lock 7, and especially in Port Colborne which is next to the mostly frozen Lake Erie. But the rest of the system is iced up. So the Canadian Coast Guard has brought in a bigger icebreaker to try and get commercial shipping moving. Here the Pierre Radisson has left Lock 3 in St Catharines Ontario on its way to Lake Erie. Steve Great shot. Thanks for the post. |
#3
posted to alt.binaries.pictures.tall-ships
|
|||
|
|||
Icebreaker Needed - CCGS Pierre Radisson out of Lock 3 2014-0317 IMG_3028.jpg
On Sun, 30 Mar 2014 20:21:58 -0400, Steve
wrote: It's the day before the Welland Canal officially opens. The Canal itself has some ice: around Lock 7, and especially in Port Colborne which is next to the mostly frozen Lake Erie. But the rest of the system is iced up. So the Canadian Coast Guard has brought in a bigger icebreaker to try and get commercial shipping moving. Here the Pierre Radisson has left Lock 3 in St Catharines Ontario on its way to Lake Erie. Steve Great shot. Thanks for the post. |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Welland Canal Official Opening - Algoma Equinox Leaving Lock 3 2014-03-28 IMG_3330.jpg | Tall Ship Photos | |||
CCGS Griffon Panorama in Lock3 2010-1202 - CCGS Griffon Panorama in Lock3 2010-1202 sm.jpg | Tall Ship Photos | |||
Tug Radium Yellowknife in Lock 3 Welland Canal - Radium Yellowknife Lock 3 2010-Sept-05 #3204.jpg | Tall Ship Photos | |||
FS: BUILDING THE ST PIERRE DORY book in Eureka CA ebay | Marketplace | |||
FA: BUILDING THE ST PIERRE DORY | Boat Building |