Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
posted to alt.binaries.pictures.tall-ships
external usenet poster
 
First recorded activity by BoatBanter: Jun 2010
Posts: 217
Default Icebreaker Needed - CCGS Pierre Radisson out of Lock 3 2014-0317 IMG_3028.jpg

It's the day before the Welland Canal officially opens. The Canal
itself has some ice: around Lock 7, and especially in Port Colborne
which is next to the mostly frozen Lake Erie. But the rest of the
system is iced up. So the Canadian Coast Guard has brought in a
bigger icebreaker to try and get commercial shipping moving.

Here the Pierre Radisson has left Lock 3 in St Catharines Ontario on
its way to Lake Erie.

Steve


Attached Thumbnails
Icebreaker Needed - CCGS Pierre Radisson out of Lock 3 2014-0317 IMG_3028.jpg-ccgs-pierre-radisson-out-lock-3-2014-0317-img_3028.jpg  
  #2   Report Post  
posted to alt.binaries.pictures.tall-ships
external usenet poster
 
First recorded activity by BoatBanter: Jun 2008
Posts: 953
Default Icebreaker Needed - CCGS Pierre Radisson out of Lock 3 2014-0317 IMG_3028.jpg

On Sun, 30 Mar 2014 20:21:58 -0400, Steve
wrote:

It's the day before the Welland Canal officially opens. The Canal
itself has some ice: around Lock 7, and especially in Port Colborne
which is next to the mostly frozen Lake Erie. But the rest of the
system is iced up. So the Canadian Coast Guard has brought in a
bigger icebreaker to try and get commercial shipping moving.

Here the Pierre Radisson has left Lock 3 in St Catharines Ontario on
its way to Lake Erie.

Steve

Great shot. Thanks for the post.
  #3   Report Post  
posted to alt.binaries.pictures.tall-ships
external usenet poster
 
First recorded activity by BoatBanter: Jun 2008
Posts: 953
Default Icebreaker Needed - CCGS Pierre Radisson out of Lock 3 2014-0317 IMG_3028.jpg

On Sun, 30 Mar 2014 20:21:58 -0400, Steve
wrote:

It's the day before the Welland Canal officially opens. The Canal
itself has some ice: around Lock 7, and especially in Port Colborne
which is next to the mostly frozen Lake Erie. But the rest of the
system is iced up. So the Canadian Coast Guard has brought in a
bigger icebreaker to try and get commercial shipping moving.

Here the Pierre Radisson has left Lock 3 in St Catharines Ontario on
its way to Lake Erie.

Steve

Great shot. Thanks for the post.
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Welland Canal Official Opening - Algoma Equinox Leaving Lock 3 2014-03-28 IMG_3330.jpg Steve[_10_] Tall Ship Photos 0 March 31st 14 01:15 AM
CCGS Griffon Panorama in Lock3 2010-1202 - CCGS Griffon Panorama in Lock3 2010-1202 sm.jpg Steve[_10_] Tall Ship Photos 0 January 20th 11 09:38 AM
Tug Radium Yellowknife in Lock 3 Welland Canal - Radium Yellowknife Lock 3 2010-Sept-05 #3204.jpg Steve[_10_] Tall Ship Photos 1 December 3rd 10 02:46 AM
FS: BUILDING THE ST PIERRE DORY book in Eureka CA ebay [email protected] Marketplace 0 November 16th 05 07:22 PM
FA: BUILDING THE ST PIERRE DORY [email protected] Boat Building 0 November 16th 05 07:05 PM


All times are GMT +1. The time now is 03:17 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 BoatBanter.com.
The comments are property of their posters.
 

About Us

"It's about Boats"

 

Copyright © 2017