Home |
Search |
Today's Posts |
#4
![]()
posted to rec.boats
|
|||
|
|||
![]()
On Friday, August 28, 2015 at 12:05:46 PM UTC-4, Wayne. B wrote:
On Fri, 28 Aug 2015 09:55:29 -0400, Justan Olphart wrote: On 8/28/2015 10:37 AM, wrote: A core sample pulled from the concrete of the Cocoli Locks where cracks and leaks have appeared does not bode well for the Panama Canal expansion project, which is on a strict deadline for completion in April 2016. http://gcaptain.com/a-concrete-sample-was-pulled-from-the-new-panama-canal-locks-and-it-does-not-look-good/#.VeBqMn3LDyc Looks like the east coast is going to have to get used to receiving it's Chinese goods by rail. I hope Oh'bamer has *his* infrastructure in order. Can't be blaming Bush anymore. === The Chinese are managing the project but it looks like someone fell asleep on the job. Quality control of the concrete is critical on a project like that. I saw a show about the construction of the new Ravenel Bridge in Charleston.. During construction they turned away a lot of concrete trucks because the concrete they contained had started to "activate" because of the heat and time in transit. It had to be just right to be used in the structure. I've never been across the bridge, but have passed under it several times in my boat going to/from Charleston Harbor. Impressive. http://www.sciway.net/sc-photos/charleston-county/ravenel-bridge.html |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
1936 Corpach Locks Caledonian Canal S_edge - 1936 Corpach Locks Caledonian Canal.jpg | Tall Ship Photos | |||
Panama Canal Birdwatching | Cruising | |||
Strange Sub in the Panama Canal? | Cruising | |||
Panama Canal | General |