New Panama Canal Locks Have A Concrete Problem
A core sample pulled from the concrete of the Cocoli Locks where
cracks and leaks have appeared does not bode well for the Panama Canal
expansion project, which is on a strict deadline for completion in
April 2016.
http://gcaptain.com/a-concrete-sample-was-pulled-from-the-new-panama-canal-locks-and-it-does-not-look-good/#.VeBqMn3LDyc
|