A core sample pulled from the concrete of the Cocoli Locks where
cracks and leaks have appeared does not bode well for the Panama Canal
expansion project, which is on a strict deadline for completion in
April 2016.
http://gcaptain.com/a-concrete-sample-was-pulled-from-the-new-panama-canal-locks-and-it-does-not-look-good/#.VeBqMn3LDyc
Looks like the east coast is going to have to get used to receiving
it's Chinese goods by rail. I hope Oh'bamer has *his* infrastructure in
order. Can't be blaming Bush anymore.
===
The Chinese are managing the project but it looks like someone fell
asleep on the job. Quality control of the concrete is critical on a
project like that.
I saw a show about the construction of the new Ravenel Bridge in Charleston.. During construction they turned away a lot of concrete trucks because the concrete they contained had started to "activate" because of the heat and time in transit. It had to be just right to be used in the structure. I've never been across the bridge, but have passed under it several times in my boat going to/from Charleston Harbor. Impressive.