Home |
Search |
Today's Posts |
#1
![]() |
|||
|
|||
![]()
Help needed with partial refit
We live aboard a 40' steel sailboat in Daytona Beach, FL. The boat is English built (1994) and has all English systems (220v AC, 24V DC, etc.). My wife and I plan to take off cruising in a couple of years. We both are working a lot of hours to build the cruising kitty. We need to have a partial refit now, but because we both work so much, neither of us have to time to proficiently oversee the project. The immediately needed projects include: removal of teak decks and replacement with non-skid, bottom job, windlass replacement, rust removal and refinishing (both interior and exterior), painting of exterior, new waste-water systems, resealing of pilothouse windows, refurbishment or replacement of cockpit wood, refurbishment or replacement of portholes, possible energy-efficient upgrade of refrigeration and possibly adding central Air Conditioning. It seems the best way to accomplish this would be to hire a competent project manager to assign and oversee the work, and to represent our interests therein. I'm looking for advice on how to find such a person, and you help will be appreciated. Thanks! |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Why I don't Buy Boating/Fishing Gear at Wal-Mart | General | |||
project planning example | Boat Building | |||
Whaleboat project | Boat Building | |||
Project looking for sailing Advisor/Mentor/Consultant | General | |||
Project looking for sailing Advisor/Mentor/Consultant | General |