LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
posted to rec.boats.building
 
Posts: n/a
Default Slow progress on the Tolman

I am finally making progress again on the Tolman skiff. For two weeks,
it came to a halt as temps here in N. FL stayed below 55 degrees in the
day and epoxy wouldnt flow, adhere or cure. Finally were getting
normal temps to mid 70s in the day so I have started up again. Got the
bottom done and will begin puttin here together.

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
trim problem - slow responding Charlie Brown General 18 December 30th 05 09:55 PM
Slow day on the ng! J Beck ASA 1 December 14th 05 07:59 PM
Delays in building the Tolman Skiff [email protected] Boat Building 0 December 5th 05 03:34 AM
Slow boat to china Joe ASA 0 November 27th 05 02:27 AM
Tolman Skiff [email protected] Boat Building 1 November 14th 05 02:20 AM


All times are GMT +1. The time now is 05:51 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 BoatBanter.com.
The comments are property of their posters.
 

About Us

"It's about Boats"

 

Copyright © 2017