Home |
Search |
Today's Posts |
#1
![]() |
|||
|
|||
![]()
Whole new mooring (mushroom , chain, ball) in 2001. Left it in 3 years,
figuring less rusting than sitting in a yard over the winter and better holding as the mushroom buried itself. . Checked upper links with diving periodically and all was well. After haling out the boat 3 weeks ago , I noticed the top shackle was sliding into the ball,(junk) and I called the yard to have it pulled. Yard guy was out of town, said he'd get to it this week. I check on it yesterday, and the ball and 10 feet of chain have drifted off to shore. The chain ends with a shackle and a swivel ; the bottom of the swivel is fine. This means (?) that the top link of the heavier chain has rusted, and that it must have gone from being able to hold a 30 foot sailboat to powder unable to hold itself in 3 weeks. Is this possible ? |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
long term mooring design - an engineering question | Cruising | |||
Rust on a mooring chain | ASA | |||
mooring anchors | General | |||
Sittin' on my mooring | ASA | |||
MOORING | General |