Home |
Search |
Today's Posts |
#36
![]() |
|||
|
|||
![]()
"Calif Bill" wrote in message
ink.net... Do not know if it still true. Used to be 50% of the population of the USA lived within 500 miles of Cleavland, OH. Includes Boston / NYC. Very good to have mass transit in this situation. Problem with most new Mass transit, is the Politics and Union required laws. Bart ends in my town. Livermore, Calif is 7 miles away, and has also been paying BART taxes since 1957. To run BART the extra 7 miles is projected to run $900 million to $1.5 billion! It is an above ground light rail. No tunnels required. Where do these costs come from? Even figuring in another train does not add up. Also, if the job could be done wrong BART did it. Non-standard guage railways. Wrong frequency and voltage for signaling the train as they did not want to pay the railroads for the right to use there system. So we spent anothor 100 million or so and still lost trains. A high tech fare system that costs more to monitor than the extra money a simple ticket or token for anywhere in the system ala Paris / London / NYC costs. Bill Well...I guess if something's done incorrectly, nobody should ever try it again anyplace else. You're right. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
New owner - Question about AC power | General | |||
What is the most reliable power set up for a powerboat? | General | |||
Power Trim | General | |||
Power Trim | General | |||
94' OMC 115 loses power after first 5 minutes | General |