| Home |
| Search |
| Today's Posts |
|
#1
posted to rec.boats
|
|||
|
|||
|
We are still under construction but I have most of the grunt work
done. 58" TV that folds up flat to the ceiling, power optional. The wiring is all in and everything works but I still have to put up the Bose speaker pots and clean up the cables. At the speed I am going my finger will be healed before I am done. I keep getting side tracked by other stuff, like a boat ride ;-) http://gfretwell.com/ftp/Kids%20TV%20bracket.jpg http://gfretwell.com/ftp/Kids%20TV%20left%20side.jpg |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Forum | |||
| Another project | General | |||
| Windlass project for my aluminum b oat is complete! (With photos ofthe project.) | General | |||
| Joe, this is a project | ASA | |||
| My new project (0/1) | General | |||