| Home |
| Search |
| Today's Posts |
|
#12
|
|||
|
|||
|
In article
outelectronicequipment ..com, "MickinDallas" wrote: Can you use a automatic solenoid changover switch when switching over from shore power to an Onan MDJA diesel genset? The instructions I have indicate that the load must be removed first, the genset started and then the load applied. Is there a way to do that with a solenoid operated automatic transfer switch? MickinDallas The bigger question is how long do you let the MDJA warm up before you apply the load to it, and does this all happen automatically? There are a pile of Third Party sequencers that can do the job, but I have never seen an ONAN Labled Setup for a MDJA Genset. Most users prefer to do the whole job manually, so they can monitor and adjust the sequence, as required for good operating practices. Bruce in alaska -- add a 2 before @ |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Forum | |||
| radar installation - cable path | Electronics | |||
| Video Interface Cable. Furuno RP-110 <> Furuno Radar | Electronics | |||
| Radar Cable Connectors | Electronics | |||
| GPS antenna cable type?? | Electronics | |||
| Ignorant Dupes | ASA | |||