LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #12   Report Post  
Bruce in Alaska
 
Posts: n/a
Default

In article
outelectronicequipment
..com,
"MickinDallas" wrote:

Can you use a automatic solenoid changover switch when switching over from
shore power to an Onan MDJA diesel genset? The instructions I have
indicate that the load must be removed first, the genset started and then
the load applied. Is there a way to do that with a solenoid operated
automatic transfer switch?

MickinDallas


The bigger question is how long do you let the MDJA warm up before you
apply the load to it, and does this all happen automatically? There are
a pile of Third Party sequencers that can do the job, but I have never
seen an ONAN Labled Setup for a MDJA Genset. Most users prefer to do
the whole job manually, so they can monitor and adjust the sequence, as
required for good operating practices.

Bruce in alaska
--
add a 2 before @
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
radar installation - cable path bruce Electronics 8 April 24th 04 05:09 AM
Video Interface Cable. Furuno RP-110 <> Furuno Radar Steve Electronics 2 March 27th 04 10:15 PM
Radar Cable Connectors Steve Electronics 2 February 5th 04 09:13 PM
GPS antenna cable type?? Steve Electronics 3 December 11th 03 08:22 PM
Ignorant Dupes jlrogers ASA 109 August 11th 03 12:16 PM


All times are GMT +1. The time now is 03:20 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 BoatBanter.com.
The comments are property of their posters.
 

About Us

"It's about Boats"

 

Copyright © 2017