Home |
Search |
Today's Posts |
#1
![]() |
|||
|
|||
![]()
I'm helping a friend replace a s/s under sole water tank with 2 new
ones. The old tank was held in place with 2 pieces of 2x4 that wedged the tank against one bulkhead on the aft end and with the 2 pieces on 2x4 wedged into another bulkhead on the fwd end- so the tank was held in place longitudinally by only the end of the 2x4 - with the 2x4 positioned on the "hard" top edge of the tank where the welded edge was. Eventually the welds cracked from the concentrated pressure of the 2x4, and the tank leaked. So how to hold the new ones - it's about 9" to the bulkhead in front. The tanks lie about 3" above the FRP hull. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Access ports in s/s water tanks - best way? | Boat Building | |||
What anchor should I buy? | General | |||
OT--Not again! More Chinese money buying our politicians. | General | |||
diesel fuel tanks | Boat Building | |||
Flexible water tanks? | General |