LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #12   Report Post  
posted to rec.boats
external usenet poster
 
First recorded activity by BoatBanter: Jul 2006
Posts: 10,492
Default New salvage scheme- hire an earthquake

On 29 Apr 2007 07:43:31 -0700, Chuck Gould
wrote:

So there was a lot of plywood used in the construction, but the hull
itself was double planked mahogany.


So it seems. I'd always been told that they were built entirely of
plywood but that doesn't look like it's entirely true, and it
certainly makes sense given the conditions and speed range that they
operated in.

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Salvaging or scavenging? jlrogers±³© ASA 81 January 30th 07 02:05 PM
Licence to hire speedboat in Greece/Spain Sailor Cruising 102 April 24th 04 06:25 PM
paradise cove trip Brien Alkire ASA 31 February 15th 04 11:17 PM


All times are GMT +1. The time now is 10:40 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 BoatBanter.com.
The comments are property of their posters.
 

About Us

"It's about Boats"

 

Copyright © 2017