Home |
Search |
Today's Posts |
#12
![]()
posted to rec.boats
|
|||
|
|||
![]() "basskisser" wrote in message oups.com... Reginald P. Smithers III wrote: basskisser wrote: Reginald P. Smithers III wrote: Reginald P. Smithers III wrote: Show me that concrete mix design that has 2500# of Portland cement in it, and weighs better than two tons, and we'll go from there. ps When I said Portland Cement weighed approx. 2500 lbs, I was referring to Portland Cement, I never said or hinted that one would put 2500 lbs of Portland Cement into a yard of concrete mix. Have you looked over your concrete mixes to see that it is very common for a yard of concrete to weigh approx. 4000 lbs? One would not expect a PE to make sure a mistake. No, it is not. Need proof? And if I show proof, will you admit your mistakes? And where is that 2500 pounds of Portland cement per yard used? Please show some criteria for your two tons, and your 2500 pounds of Portland. I tried to be helpful and show you many links showing you the exact weight of concrete, and the exact weight of Portland Cement, you prefer to ignore them. I didn't want you to continue with your silliness, but I should have known better. The question wasn't "is all concrete 4000 lbs per year", because there are light weight concrete mixes that weigh less, but as Bill said, concrete can and does weigh approx. 4000 lbs. The fact that you fail to see this, does understand why you are not employed. No, you are wrong. Bill actually said that concrete weighs 5000#. Please show what facts you have that I am not employed, first. Now, where WERE those links that you shown that states that there is 2500# of Portland cement in a yard of concrete? You DO know, seeing how you are acting the expert here, that in reality, there's somewhere around 5 bags @ 94 pounds in a typical 3,000 psi mix, for a total of 470# don't you? So, I'd really, really like to see this mix design that uses 2500#, because with a water/cement ratio of .53 maximum, you'd have approx. 1,325 pounds of water. But you know this, right? Now, here's the thing. a yard of concrete is an AREA. This 2500# of cement takes approx. 12.72 cubic feet of area. The water that we need per ACI 307 would take an area of approx. 20.64 cubic feet, for a total of 33.36 cubic feet. You're now at more than a yard before you add in the largest volumes, which are the coarse and fine aggregates, with proper gradation of course. So, for an F'c of 3000 psi, the aggregate total is going to be close to approx. 10 or 12 times the amount of concrete. So now you have a "yard" of concrete that is 400 or so cubic feet! So, I'm really confused. Please show me where you are correct, and I am wrong. Now remember something about that 4,000 pounds you are referring to. There is a factor of safety involved for that number. A cubic foot of normal weight concrete doesn't weigh 150 pounds, although that number is thrown around alot. The actual weight of normal weight concrete is around 125 pounds per cubic foot, or 3375 a yard. If you'll look at ACI guidelines you'll even see that there criteria uses 125# per cubic foot dead load for elevated slabs! And even THAT has a factor of safety. So I made an error of saying concrete weight is 5000# per yard. That is what the guy told me when I picked up a yard of Concrete in a u haul it trailer. So 4000# of concrete and 1000# of trailer. I am an electrical engineer. What my degree is in, while you claim to be a PE structural engineer and claim that concrete weighs less than 3000#. Major faux paux! I really doubt you are a pe or an engineering graduate now. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Strength of Steel Vs Carbon | ASA | |||
Fiberglass loss of strength | Cruising | |||
( OT) Kerry Military Records | General |