LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #11   Report Post  
*JimH*
 
Posts: n/a
Default




"Starbucks" wrote in message
news
JohnH,
There is lots of blame to spread around to all governmental agencies. The
section of the levee that broke, was one of the few sections that had been
upgraded to the new standard, that was supposed to hold up to a direct hit
from a hurricane.

I would assume people will be asking why it failed.



It was engineered and built with the best known data at the time. However,
the build had never been tested in real life. Now it has and has shown to
be inadequate.

Back to the drawing boards.

This failure, however, will help in future designs.


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
OT Kerry's secret plan Bart Senior ASA 1 August 3rd 04 08:13 AM
Dolphin/Wahoo Management Plan Approved for Atlantic Capt. Dave General 0 January 10th 04 03:37 AM
viking ship plans ripoff Boris Beizer Boat Building 4 January 1st 04 07:51 PM


All times are GMT +1. The time now is 08:40 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 BoatBanter.com.
The comments are property of their posters.
 

About Us

"It's about Boats"

 

Copyright © 2017