LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #9   Report Post  
posted to rec.boats.cruising
external usenet poster
 
First recorded activity by BoatBanter: Jul 2006
Posts: 10,492
Default Maine Passage - Day 5

On Mon, 04 Aug 2008 10:15:10 -0700, Gordon wrote:

The fix is a tie rod running from the step to the partner with a
strenghtened cabin roof. Top can't ride up, sides can't cave.


Yes, and the whole boat will be stiffer as a result, like a big box
beam.

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Maine Passage - Day 4 [email protected] Cruising 8 August 8th 08 05:18 AM
Flying Pig - Maine Passage - Day 2 [email protected] Cruising 10 August 7th 08 12:57 PM
Maine Passage - Day 3 [email protected] Cruising 2 August 3rd 08 11:23 PM
Flying Pig - Maine Passage - Day 1 [email protected] Cruising 4 August 1st 08 04:02 PM
NW Passage Joe ASA 4 January 22nd 07 05:57 PM


All times are GMT +1. The time now is 02:24 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 BoatBanter.com.
The comments are property of their posters.
 

About Us

"It's about Boats"

 

Copyright © 2017