Home |
Search |
Today's Posts |
#1
![]()
posted to rec.boats.cruising
|
|||
|
|||
![]()
Many here have expressed an interest in what's going on with us; I
just posted this to the Morgan lists: By the way, how are your repairs going? We've had some delays on our end but we should be heading your way Tuesday of next week. Hope this helps. Chris and Robin Blair SV Eliza Hi, Chris/Robin and list, Once I get the ENCs sorted out (Maptech made them; surely, if not already, there will be a capn reader for them), I have the entire NOAA inventory available, and as you've pointed out, up to date instantly. I don't know how the capn works WRT duplicate charts - I presume it chooses the most recent to display - but I may have to spend some time removing duplicates; that's a very minor nuisance. Work on Flying Pig is poking (pardon the expression) along. Lydia's redone the boot stripe and reveal strip, finishing yesterday, and has laid on the first coat of AwlSpar, the undercoating for AwlBrite, the exterior varnish treatment we'll use for the cap rail on the cockpit, matching the toe rail. I've added more epoxy to a couple of places where more was needed in areas we've redone on the bulkhead retabbing/reattaching. Some pix will be up soon on those items. Generally speaking, we're so happy we could do cartwheels. As identified in our initial assessment, there's nothing which can't be cured with a great deal of labor (and a relatively small amount of parts/supplies). I'm currently working on a "thanksgiving" post for my log; the number of areas for which we're thankful is immense. So, labor being the majority of the expense, and our doing it nearly all ourselves (the replacement of the solar panel, and other electrical stuff, in the interest of time, is being done by the original contractor, but he's taken the position that the departure of the KISS had to have been something he mis-did in the original installation, and is replacing that free, the special shock mounting unit [usually noise reduction measure for those sleeping directly below a KISS, but a non- issue for us, as it was totally quiet] which will allow removal in another case of a short travel lift [the yard in Marathon's lift was so old they had to remove the backstay to lift us, and cut off the KISS mounting pole to get off the boat when they dropped us] being the only cost in that part), it is really gratifying to see all the work done without the usual pile of receipts on the Nav. Even the epoxying (and later engine/drivetrain realignment/test for runout) is a tradeout with a shipwright in our yard for the time I spent in Ft. Lauderdale helping him get a charity boat ready for delivery to this yard for refit. Essentially, we're confident that Flying Pig will be returned to entirely sound condition. I have no need for one, we being uninsurable, but I'm thinking of having a survey (insurance grade) by our most picky of surveyors, the one who used to be Quality Control and Service Manager for Morgan during the entire production run of M46x, just for confirmation, and later record should things change, or for the inevitable time somewhere long in the future where we sell her. He's assured me that if we're doing as we have (and as is my wont, documenting it copiously with pix), he'd have no problem with signing off on us as as good as new. Actually, of course, as we have already/now go about replacing and upgrading systems, the boat's substantially better than the usual M46, as most won't have had all that unless someone's just done a refit. However, the point of that would be to dispel any concerns - ours, our families', and any future interested parties (insurance, new owners, etc.) - of seaworthiness once finished. As we go through the boat, we've found that the bulkhead delamination/detabbing is actually pretty localized, and the start and end points are pretty much visible. When we epoxy those areas, we're compressing (jacking, in essence) the existing fiberglass to cause the epoxy to further penetrate the wood, and put the glass fiber flap back in position. We're using a one-to-one mixture which, if not in a pile where heat accelerates it, takes about 4 hours to fully set, so penetration, as well as flowing into open areas, is very good. So, we're happy to say that we believe we'll have substantially all of the damaged areas reset, and those which we can't reach on which to do compression, we've been flowing epoxy into, allowing it to set (not overflowing the downhill parts, including doing some modeling clay damming to hold those areas we can't compress from overflowing out of the joint), and doing it again, thus making the same bond, but without compression, as the rest of it. In addition, we're bonding some places where there were only 'holding' tabs - typically, settee, vanity, cabinet and reefer fronts, which as original had only one side tabbed, and open space in all the rough-cut fits - further adding to the reinforcement of the adjacent bulkheads' repairs. As such, I have no concerns whatsoever, after we've had a rigging survey, and, should there be any issues there, having addressed them, on the integrity of our fine craft. Still lots of work to be done, but we're doing it ourselves, and acquiring more skills and confidence as we go. We've moved our Captain's course time to a couple of weeks from now, rather than coming back in June, avoiding the necessity of finding someplace to secure our boat, doing the travel from wherever we were at the time, finding someplace to stay, dealing with local transport (on the presumption that we'll pass along the vehicle we were given) and allowing us to continue work, perhaps do sea trials in the weekdays not in classes (testing on May 7), and even, perhaps, get to enjoy some of St. Petersburg's lovely attributes. Thanks for asking :{)) L8R Skip, off to AirFest2007 at McDill, watching numerous flying non-pigs Morgan 461 #2 SV Flying Pig KI4MPC See our galleries at www.justpickone.org/skip/gallery ! Follow us at http://groups.google.com/group/flyingpiglog and/or http://groups.yahoo.com/group/TheFlyingPigLog There is no such thing as a problem without a gift for you in its hands. You seek problems because you need their gifts. |