Home |
Search |
Today's Posts |
#1
![]()
posted to rec.boats.cruising
|
|||
|
|||
![]()
New Flying Pig Pix Links
I know that this will likely result in the usual one or two unsubscriptions from The Flying Pig Log due to too much traffic :{)) But I promise to be regaling you with tales of our travels pretty soon. However, in response to many requests, based on "it didn't happen, if there aren't pictures to prove it," I offer links to the URLs of the most recent (in the last month or so) of the stuff we've been up to aboard (well, on the hard in Riverside Marina in Ft. Pierce FL, if that counts, even though we've lived aboard for all but the last bits). I'll warn you that unless you're "really" into boat work, you can probably skip these, but for those who have the interest, either professional or morbid, they may be enjoyable. As above, I promise to be back in the water soon, but we still have a few things to accomplish which aren't on these galleries. Also, in light of the realities, I've renamed the home gallery for these to the 2011-2012 refit! We have done an inordinate amount of work on our rudder. The first set is of structural improvements we did to the skeg; further back (click the "prev 28" at the bottom left of the screen if you want to see those), you can see others which include strengthening the rudder itself, and how we resolved the pits in the shaft, but those have been up for a while. The second set is of our trial raising of the rudder to assure proper fit of the new bolts we bought for the gudgeon which holds it up, and the third is of the successful reinstallation of the rudder into the shaft log and gudgeon - with reinstallation of the steering and packing gland to follow when we get to them. http://justpickone.org/skip/gallery/...ents&start=158 http://justpickone.org/skip/gallery/...and+Bo lt+Fit http://justpickone.org/skip/gallery/...installa tion The next couple are of the continuing saga of our anchor system upgrade. We substantially stoutened our windlass base, including repairing some deck damage, and addressing some interior water damage in the first link, and installed a monster chain stopper to go with the much heavier new anchor we bought earlier, in the second. The same applies about looking at earlier stuff, but in this case you'd click the "Anchor System Refit" at the top of the page for other galleries as well. http://justpickone.org/skip/gallery/...epair&start=28 http://justpickone.org/skip/gallery/...FChain+Stopper My last missive had to do with the immense satisfaction we had with all the work we put into the bottom as we laid on the first of our layers of barrier coat. It's what keeps the water away from the raw fiberglass, preventing future blisters. Since we need not less than 12 mils to assure that, we've put on more than that already, and have one more coat to go. http://justpickone.org/skip/gallery/...s+Barrier+Coat There will be a few more pictures to come on the next one, but we also did a lot of work on our drive train. These are of the installation of the checked and shortened shaft and the return to a standard-type packing gland (which keeps the water out of the boat while still allowing the shaft to turn). http://justpickone.org/skip/gallery/...+Packing+Gland Like so much of this refit, nothing's been simple, it seems. We wound up virtually rebuilding the cockpit table we had built for us. There will be final pictures added to this gallery when we get a chance to take them, but the end result, other than the hinges which aren't shown in the leaves, here, is pretty much a done deal. Here, too, there's LOTS of pictures before where this starts, which is just the current work http://justpickone.org/skip/gallery/...Table&start=49 Our staysail is supported below decks by a bobstay. Otherwise, the tension on the stay would be take entirely by the deck. The previous one's attachment to the inner deck/stem of the boat had broken under the load. This is the new end and installation of the turnbuckle and fork for that bobstay. http://justpickone.org/skip/gallery/...ay+Replacement Last, but not least, in the past, before we owned the boat, the anchor locker's (where the wet chain goes when it comes in) drain had clogged. We freed it, but not before the prior owner's many years of standing water had damaged the bulkhead, and the facing inside the Vee berth. Lydia removed all the prior veneer, leveled the underlying plywood, and we installed new laminate in the same color as the rest of the white trim in the boat. http://justpickone.org/skip/gallery/...ead+Of+Repaint A fairly busy 4 weeks we've had, and we're thankful that Isaac's going to give us a miss, making it so I only had to do some securing rather than stripping the entire boat in order to survive the wind and rain which is coming. As it's starting to pick up as I type, I'll get this up on the net, and go to the home in Vero Beach we're visiting while we do the last bits without refrigeration. Stay tuned! L8R, y'all Skip Morgan 461 #2 SV Flying Pig KI4MPC See our galleries at www.justpickone.org/skip/gallery ! Follow us at http://groups.yahoo.com/group/TheFlyingPigLog and/or http://groups.google.com/group/flyingpiglog When a man comes to like a sea life, he is not fit to live on land. - Dr. Samuel Johnson |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Where is Skip and the Flying Pig? | Cruising | |||
Flying Pig ? | Cruising | |||
Flying Pig Repairs | Boat Building | |||
Flying Pig Repairs | Cruising | |||
A Flying Pig First | Cruising |