LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #4   Report Post  
Roger Derby
 
Posts: n/a
Default

Not a new subject, but ...

I've had very good luck making 8:1 scarfs by supporting the two pieces atop
one another, staggered, and marked, and then planing (power and hand) for a
plane surface. Check with a straight edge. The angle is not critical, but
8:1 is thought minimal by many.

Example: to scarf two 2x4's (1.5" x 3.5"), mark back 12" (= 8 x 1.5) from
the end of each and clamp them together, staggered, with a firm support
under the lower one. If there's a "preferred surface" then flip one piece
so the surfaces will match. Remove wood until there's a smooth ramp from
the innermost mark (the one that's 24" from the end).

Flip one piece so that the two ramps are face to face, jiggle around until a
straightedge lies flat touching both surfaces, and scrawl some "witness"
marks across the join. Ensure other alignments are correct.

Protect your work surface with polyethylene.

Coat both surfaces with unthickened epoxy to fill the end grain and avoid an
epoxy-starved joint, then apply thickened epoxy (I like wood flour for
thickening). Put the two pieces together so the witness marks line up,
clamp lightly, and go away for a day or two.

It doesn't hurt to heat the pieces of wood before applying the epoxy. As
they cool, the epoxy is drawn into the wood. Otherwise the heat generated
by the curing epoxy can cause air to bubble out of the wood disturbing the
epoxy in spots. The heat makes the epoxy cure faster too.

Roger

http://derbyrm.mystarband.net/default.htm

"Bert van den Berg" wrote in message
...
I have seen wood scarfed for wood mast construction where there is a long
joint made by overlapping two pieces of tapered wood. Can anyone tell me
how you physically create the long tapered joint? I have been thinking
of
using a thicknesser with multi passes.

Regards,

Bert van den Berg




 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is Off
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
tyvek (long) William R. Watt Boat Building 2 June 30th 04 05:09 AM
rec.boats.paddle sea kayaking FAQ [email protected] General 0 April 17th 04 12:28 PM
rec.boats.paddle sea kayaking FAQ [email protected] General 0 February 16th 04 10:02 AM
Mast Rake and Mast Bend DSK ASA 48 January 16th 04 08:07 PM
Steam bending basics?? steamer Boat Building 11 August 28th 03 04:29 PM


All times are GMT +1. The time now is 02:15 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 BoatBanter.com.
The comments are property of their posters.
 

About Us

"It's about Boats"

 

Copyright © 2017