Hi, Richard,
Thanks for the erudition and education!
So, if I read your stuff (clipped for brevity) correctly, the left side
nipple on the top of the dome is where I'd put new gas after evacuation. Is
that also where I'd evacuate it?
The one out of the side under the dome connects to the point which leaks,
and has a T'd connection point on it. That's the one I was instructed early
on to vent the slight overcharge from.
I (think I) understand from your tutorial that there is no real means of the
typical testing setup on my unit - no place to connect to high and low
side - just for evacuation and gassinng?
Thanks again for your assistance.
L8R
Skip
--
Morgan 461 #2
SV Flying Pig KI4MPC
See our galleries at
www.justpickone.org/skip/gallery !
Follow us at
http://groups.yahoo.com/group/TheFlyingPigLog
and/or
http://groups.google.com/group/flyingpiglog
"Twenty years from now you will be more disappointed by the things you
didn't do than by the ones you did do. So throw off the bowlines. Sail
away from the safe harbor. Catch the trade winds in your sails. Explore.
Dream. Discover." - Mark Twain