How many more?
Almost done. Steel door frames are up, most of the steel skins are on the
doors. Some lights hung, temporary 415V power connected from the house, still
waiting for an excavator to turn up & dig the power trench. Another couple
weeks work after I get back from dry dock. I'll post some pix then.
As I said elsewhere I've just bought another horizontal milling machine.
Really looking fwd to having the Arboga radial arm drill back, I'm tired of
step drilling holes with a cheap POS Chinese drill press. The Arboga can drill
50mm dia holes in a single pass. If you can afford the drill bits.
PDW
Scotty wrote:
How's the shed? Done yet?
Scotty
"PDW" wrote in message
...
Maxprop wrote:
"PDW" wrote in message
...
OzOne wrote:
Admittedly we got in early, and now are working on
getting the illegal
|