Still working under the tarps. Installed a new sound sys this week: 2
6x9 3 ways, 2 6.5" round 3 ways, AM/FM cassette/CD deck, 10 disc CD
changer. Next week, re-commission/run-up, pressure wash the tree junk
off the driveway so I can get it back in on return, and
then...THEN...wash the thing (UGhhh) load it up with boat food, wait for
some sun and something over 60° and head for the San Juans.
JR
JimH wrote:
I will be taking the boat to the marina on Friday to start my Spring
projects previously detailed (gotta get some honeydo chores tomorrow).
Depending on the weather I should be done with exterior work by sometime
next week. In between gelcoat repairs, epoxy barrier coats and bottom
painting I will also be working on the engine and interior, thus cutting
down the total down time to get the boat projects completed.
If I can get it all done and get the boat splashed by May 8th I will be
happy.
So how about you?
PS to those Southern boaters wanting to rub it in:
http://tinyurl.com/owvba
--
--------------------------------------------------------------
Home Page:
http://www.seanet.com/~jasonrnorth