Thread
:
Extreme Makeover
View Single Post
#
2
posted to rec.boats
-rick-
Posts: n/a
Extreme Makeover
wrote:
Biggest downside is the "10-week" estimate of the time required to
finish the work. Spring will be well underway before we get our boat
back, but she will be a headturner, for sure.
Sounds like a good plan except you clearly need a second
boat for backup or a "loaner" for the duration of the work.
Can't you arrange a long term test or something?
-rick-
Reply With Quote