View Single Post
  #31   Report Post  
John H
 
Posts: n/a
Default

On 17 Mar 2005 15:38:23 -0800, wrote:

Sections of the canal that are slab sided include the reach between the
Fremont Bridge and Salmon Bay, as well as the Montlake "cut".

The area where the tragedy occured has a rock embankment.


Thanks for clarifying that.
--
John H

"All decisions are the result of binary thinking."