![]() |
Tug - CAPT. HARRY with OSG HORIZON 9-12b.jpg
1 Attachment(s)
After the boats went down the channel , they went up river and the OSG anchored before
turning around that evening and heading down to the bay to lighter off another jumbo tanker . The rigs were about 1.5-2 miles away . End of the set . Lee |
All times are GMT +1. The time now is 06:35 PM. |
Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004 - 2014 BoatBanter.com