View Single Post
  #4   Report Post  
Wayne.B
 
Posts: n/a
Default

On Mon, 11 Apr 2005 00:15:19 -0700, Jim Richardson
wrote:

What about just using orings? should be easy enough to size, and placing
them on the bolts, before laying the track down (the second time, doing
the drilling one at a time sounds like a good idea to me) Neoprene
orings should survive well, but maybe I am missing something?


=============================

I guess anything is possible but I've never seen it done. From a
structural stand point it is important that the track end up firmly
clamped, flat on the deck. That might be hard to achieve using actual
o-rings.